Garage Slab Siding Starter Course
Start with a level chalk line for the bottom starter strip and check the level periodically as you go up.
Garage slab siding starter course. Plywood above this line to hold out the bottom of the first row of siding and nail the starter strip to this plywood. Fasten the panels in the center of the nailing slots see getting started for more information for specific information on fastening and fasteners. Garage doors openers spring repair is located at 2610 union st oakland ca 94607 510 698 5106. Garage door frame.
Do not use a j channel. I have had better luck with white silicon than clear. The clear seems to debond from concrete after awhile. Make sure the panel is securely locked before fastening.
This video shows how to install a starter strip for vinyl and polymer siding installation. Be sure that nail length is sufficient to penetrate framing or framing plus nailable sheathing a total of 1 1 4 32mm. The area on a piece of siding that allows for another piece of siding or trim to be inserted. Whoops this is not going to be good i thought to myself.
It is an inexpensive approach to a combination floor footing system that can even be used in deep frost country if the soils drain well so as to prevent frost heave damage to any part of the garage foundation and. Then nail a 3 1 2 in. Simply amazing garage doors i need something like this in my portfolio. Cut vinyl pieces to fit with a saw or snips.
The first course row of panels should be placed in the starter strip and securely locked along the entire length of the siding panel. For vinyl use special trim strips which should come with the. By doing it ricks way you can leave the starter strip high enough off the slab to get the first course of vinyl into the starter strip and still prevent water from seeping under the shed. Staret strip secures the first course of siding to the home.
This should be nailed every 6 inches with it s lower edge running along the chalk line. A course of siding refers to one row of siding that runs the length of an exterior wall. Of course sliding my knife under the siding at the concrete i didn t hit anything. The type 1 foundation shown at the left is usually suitable for a one story garage design that your building official can be certain will never be used for human habitation.
Step 6 finish your garage siding with trim. Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle. As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip. The entire rim joist was bug infested and rotted away over the whole length of the patio connection with the house.