Garage Slab Siding Starter Course 6 Clearance
Installing vinyl siding to an unlevel garage in this application throw the metal starter strip away after papering the wall with a two layers of 30 minute building paper install a j trim parallel to the bottom of the wood frame wall but overlapping its bottom 1 2 to 3 4 inch.
Garage slab siding starter course 6 clearance. Epoxy in some anchor bolts to keep the garage in place. We cut the wood siding 2 1 2 in. For pricing and availability. Amerimax 3 in x 120 in unpainted aluminum starter strip metal siding trim.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding. This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard. Since it is a rehab and then tie down a sill and put the garage back on it. I would put an 6 or 8 thick block 8 high on the existing slab.
Spectra 24 in x actual length smooth black over brown trim coil trim coil metal siding trim. Wall sheathing and 2 in. If you have vinyl aluminum or steel siding it s probably easier to remove it from the entire garage wall and reinstall it after the addition is built. This should be nailed every 6 inches with it s lower edge running along the chalk line.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle. Beyond the width of the addition to allow for 1 2 in. Anchor bolts and sills. As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
By doing it ricks way you can leave the starter strip high enough off the slab to get the first course of vinyl into the starter strip and still prevent water from seeping under the shed. This requirement is not just to prevent damage to the siding it serves a couple of other functions as well. Maintaining proper clearances reduces access to wood structures behind the siding by wood destroying insects or damage from water that might. A 6 mil polyethylene or approved vapor retarder with joints lapped minimum 6 inches shall be placed between a concrete slab on grade and the base course or subgrade.
Flashing must be located beneath the first course of masonry above finished ground level above the foundation wall or slab and at other points of support including structural floors shelf angles and lintels when masonry veneers are designed per section r703 7. Having your siding too close to the ground is just asking. Do not use a j channel. The clear seems to debond from concrete after awhile.
When building your new home have you ever wondered how close your siding needs to be from the ground. I have had better luck with white silicon than clear. Ever wonder if siding is too close to the ground.